boiler detail of bhusan angul project

Product Thermal Capacity: 1 - 20 t/h

Working Pressure: 0.7 - 2 Mpa

Available Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Available Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

Get a Quote Send Message

Introduction of WNS gas / oil fired steam boiler:

WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.

Technical advantages:

1. Digitized manufacture
The key part such as material cutting, rolling, drilling are proceeded by advanced CNC machining process to reduce the assemble stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine and looks tidy and beautiful.

2.Easy operation and maintenance
Fully automatically operating, with automatically adjustment and protection of burning, water level, temperature and steam pressure.

3. Longer working life
Smoke tube and tube sheet connection is expanded first to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boilers working life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will have 100% radiographic inspection.
Fin tube us ND steel or stainless-steel material which avoid low temperature corrosion.
Inspection procedure point is set up to guarantee the sequence of expanding and welding, avoid cracking of the tube sheet holes.

4. Less fuel consumption
High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ to control heat lost.
Sufficient steam storage room and heating area makes boiler to generate high quality steam and high thermal power.
Condenser is added to reuse the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce emission temperature, which can increase the thermal efficiency above 98% and save operating cost.

Boiler Design & Installation | Projects | Burns & McDonne

Deliverables included layouts, piping routing, boiler and feedwater system specifications, building specifications, foundation design, electrical design and tie-in designations. Burns & McDonnell purchased all equipment for this project.

BHUSHAN STEEL LTD. in Angul, Odisha, India - Company Profi

Founded: 14 Sep, 2005 about bhushan steel ltd. Registered in 2015 , BHUSHAN STEEL LTD. has made a name for itself in the list of top suppliers of Steel & Stainless Steel Products & Components ,Metals & Alloys in India. The supplier company is located in Angul, Odisha and is one of the leading sellers of listed products.

Home | Tata Steel BSL Lt

It has come to the notice of Tata Steel BSL Limited management that some fraudsters, with some ulterior motives, are issuing fake appointment letters to jobseekers in the name of the company.These fraudsters and unauthorized persons are using the name of the company to solicit job applications and make the gullible jobseekers pay processing fees or deposit some amount by sending false e-mails

Working at Bhushan Steel in Angul, Orissa: Employ

During project time it's difficult to handle some contractors,but later on good results come.Managment very strict to any negligency,that's bad for the business.How to maintain good exposure is very much important otherwise you have to suffer in political way.overall good environment to work on bhushan.

project cost 5mw power plant using boil

project cost 5mw power plant using boiler. cost of 250 mw biomass power plant supply hot water boiler . a 5 mw biomass MW level Power plant using Biomass Gasifier Janastu Cost of biomass per kWh 3.45 (Coconut Shell) 2.4(Wood) Hands on experience in operating own 1 MW grid linked Arashi Hi-Tech power plant from * * * lexie@zozen.com > Get A Quote >

PROCESS DESIGN OF STEAM BOILERS (PROJECT STANDARDS

PROCESS DESIGN OF STEAM BOILERS (PROJECT STANDARDS AND SPECIFICATIONS) Page 3 of 45 Rev: 01 April 2011 SCOPE This Project Standards and Specifications is intended to cover minimum requirements for process design of field erected water tube boilers. REFERENCES Throughout this Standard the following dated and undated standards/codes are referred to.

Boiler – Fundamentals and Best Practic

User rating: 3.7/5 Boiler – Fundamentals and Best Practices By: Boiler - Fundamentals Steam production and steam uses Steam purity and steam quality Therefore the boiler water will contain more solids than the feedwater This Concentrating effect is called The Cycles of Concentration or The Cycles.

Bhushan Power & Steel Limit

The integrated power and steel project at Orissa is a landmark in the nation’s infrastructure development. It combines our deep expertise with the best technology that the world offers to integrate the entire steel manufacturing process – from mining to the production of value-added products.

Boiler Project Fundamenta

Boiler classifications The most basic definition of a boiler is a closed vessel in which water is heated until the water has reached the desired pressure and temperature. This definition is extremely broad and the project team will need to narrow down the specific type of boiler that will be required. Some manufacturers use

Orissa orders Bhushan Steel to stop all project activiti

Feb 01, 2014· Bhushan Steel Limited’s integrated steel project in Dhenkanal and Angul district of Orissa has hit a wall. The state forest department has ordered district collectors to stop all activities over the 61.48 hectares of forest land on which the company has built its plant.

BHUSHAN STEEL LIMITED MERAMANDALI, DIST. DHENKANAL

The project falls under category A, section 3 (a) of EIA notification September 2006 and amendment thereof vide notification no. S.O 3067 (E) dated 1st December 2009. Need for the Project: The Indian steel industry has entered into a new development stage from 2007-08, riding high on the resurgent economy and rising demand for steel.

Contact Us

zhulin@zozen.com

No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China

0086-510-68530066, +86-13506151292

Get Latest Price
Get in Touch

If you have any problems about our product and service,please feel free to give your inquiry in the form below. We will reply you within 24 hours as soon as possible.Thank you!

  • Boiler type
  • Name
  • email
  • Phone or Whatsapp
  • message
I accept the Data Protection Declaration

Copyright © 2020.Zhongzheng Boiler Co., ltd. All rights reserved.

top