MENU
products
  1. Home
  2. --
  3. Industrial boilers

green boiler post harvest

Product Thermal Capacity: 1 - 20 t/h

Working Pressure: 0.7 - 2 Mpa

Available Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Available Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

Get a Quote Send Message

Introduction of WNS gas / oil fired steam boiler:

WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.

Technical advantages:

1. Digitized manufacture
The key part such as material cutting, rolling, drilling are proceeded by advanced CNC machining process to reduce the assemble stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine and looks tidy and beautiful.

2.Easy operation and maintenance
Fully automatically operating, with automatically adjustment and protection of burning, water level, temperature and steam pressure.

3. Longer working life
Smoke tube and tube sheet connection is expanded first to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boilers working life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will have 100% radiographic inspection.
Fin tube us ND steel or stainless-steel material which avoid low temperature corrosion.
Inspection procedure point is set up to guarantee the sequence of expanding and welding, avoid cracking of the tube sheet holes.

4. Less fuel consumption
High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ to control heat lost.
Sufficient steam storage room and heating area makes boiler to generate high quality steam and high thermal power.
Condenser is added to reuse the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce emission temperature, which can increase the thermal efficiency above 98% and save operating cost.

Greenhouse - Post Harvest Solutions - Hydro Systems

Hydro Systems manufactures a line of agricultural products that can mix and proportion chemicals for post-harvest treatment. Contact Green-tek. All of Hydro Systems’ irrigation and horticulture equipment is distributed by Hydro’s partner and master distributor, Green-tek. For more information about the equipment please click on the products

Harvest Green homes for sale and rent - H

Harvest Green is a subdivision located in Fort Bend County. The Harvest Green subdivision is surrounded with restaurants, education opportunities, entertainment venues, shopping and more. See below for more information on the surrounding resources for the Harvest Green subdivision. Harvest Green Real Estate Overview:

POST HARVE

POST HARVEST 1.- Vegetable processing - general information . The vegetables may be marketed in different ways. The "in-natura" form is the simplest one for commercialization, but it requires fast consumption. The post-harvesting treatments and the different processings are …

Harvest & Post-harvest Handling - WordPress.c

Green & Snap Beans •Harvest during morning before midday sun; do not harvest when wet. •Avoid hydro-cooling; wetting beans can cause rust and water damage. •Ready to harvest at about 50-60 days, typically 8-10 days after flowering. •Harvest when pods are still young and tender, should be bright

Postharvest - an overview | ScienceDirect Topi

Post-harvest management of pulses is a complex problem requiring a multidisciplinary approach; there is a need to combine the current and innovative technologies to minimize the post-harvest losses. Post-harvest handling, transportation and storage are the most important factors influencing post …

Greens Harvester | Johnny's Selected See

The manual Greens Harvester is a simple yet effect technology allowing a single person to harvest up to 100 lb. of greens per hour. The scalloped blade cleanly slices the leaves, which are collected into a cloth basket. One person can cut the entire width of the bed at once.

Green Boiler Technology | Hurst Boiler and Welding, In

User rating: 5/5 Green Boiler Technology at Hurst Boiler. Our long-standing environmental commitment is what brings us closer to the world around us. Home; Environmental Commitment; Our long-standing environmental commitment is what brings us closer to the world around us. With an ever-increasing focus on global warming, conservation and sustainability, it is

when to harvest broilers? | BackYard Chickens - Learn H

Aug 25, 2012· It seems popular to broiler 'em at 8wks. But they are tiny, not much meat for the work. My BO's are 5mo and finally look big enough to eat. The drumsticks and breast still look skinny. Maybe I am just used to hormone infused chicken from the store. Should I get a different breed for meat

Quick Cut Greens Harvester — The Market Garden

The Quick Cut Greens Harvester The Quick Cut Harvester (QCH) is a must for any small or urban farmer looking to market a 100 lbs of salad mix per week or more. It replaces cutting greens with field knives, doing the work 10 folds faster.

Try the Quick-Cut Greens Harvester | MOTHER EARTH NE

Try the Quick-Cut Greens Harvester Check-out this farming tool called the Quick-Cut Greens Harvester and how it allows market gardeners harvest greens more efficiently than ever before. By Cheryl Long

Raw Deal: Green boiler scheme leaves gardener with

Jul 16, 2019· Launched in 2013, the Green Deal was promoted as “the biggest home improvement programme since the Second World War”. It promised homeowners solar panels, insulation and new boilers, with no

Contact Us

zhulin@zozen.com

No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China

0086-510-68530066, +86-13506151292

Get Latest Price
Get in Touch

If you have any problems about our product and service,please feel free to give your inquiry in the form below. We will reply you within 24 hours as soon as possible.Thank you!

  • Boiler type
  • Name
  • email
  • Phone or Whatsapp
  • message
I accept the Data Protection Declaration

Copyright © 2020.Zhongzheng Boiler Co., ltd. All rights reserved.

top